Copyright 2010: High Performance Systems | Industrial Flooring. All Rights Reserved.
Here was a soup producing facility in bad shape. This substrate was on a mezzanine, so we had to install Hubbell's "pancake" drain system. Thereafter, we need to rehabilitate the substrate to allow for an application of GP's Fastop urethane slurry system.
This project was done in 5 days turnkey, allowing them to get back to the business of making soup!